Qinzhou Port Automated Container Terminal Project
For this project, 4 berths for 100,000~200,000DWT container ships with total length of 1301.5m have been constructed together with corresponding water area and land supporting facilities. The annual design throughput capacity is up to 2.63 million TEU. It adopts the firstinnovated access route for external container truck in U-shape perpendicular to the quay line.