East Coast Rail Link Project, Malaysia
Undertook the geotechnical survey for Section A of the project's new route with chainage from CH0+000 to CH213+500. Proposed a new idea of adopting the combined use of hand drill + McTosh probe + cross plate shearer instead of the traditional drilling rig for the geo investigation in the swampy area, successfully introduced the electric cross plate shear test equipment, and implemented the high-quality Pore pressure static penetration test on the site.