Public Fill Disposal Works for Bid 3206 for the Third Runway Project at the Hong Kong International Airport
  • Project area
    Integrated transportation field
  • Project type
    Airport engineering
  • Project location
    Hong Kong
The project is located at the north side of Hong Kong International Airport (HKIA), which is an important sub-project of HKIA third runway section 3206. The main content includes screening and sorting of construction waste in the  public fill banks at Tseung Kwan O Area 137 and Tuen Mun Area 38; and delivering the screened and qualified materials to the construction site of the third runway project of HKIA for backfilling and roiling compaction by marine transportation. CCCC-FHDI undertook the fill testing and foundation inspection for the project, adopting Hong Kong, European and American standards, and utilizing advanced equipment such as Geomil's land-based CPT equipment for the construction work.
Headquarters contact information
020-32332222
292 Lijiao Road, Haizhu District, Guangzhou, China Communications Southern Design Building
© Copyright 2023CCCC- FHDI ENGINEERING CO,LTD. 版权所有粤ICP备2022126036号-1 粤公网安备:44010502001425号Powered by vancheer
TOP