Nigeria Liquefied Natural Gas Limited T7 Project LNG Terminal Project
A new LNG jetty with a maximum berthing capacity of 217,000 m3 LNG carriers, consisting of a 695-meter approach bridge (pre-stressed structure), a working platform, three berthing piers and six bollard piers. The piers are connected by nine steel pedestrian bridges and the central part of the approach bridge includes a construction platform. A new passenger terminal (NPT) is built: it mainly includes a 48-meter approach bridge and a floating platform. The superstructure of the approach bridge adopts steel truss; the main structure of the floating platform is a rigid barge with a size of 10×36 meters, using four steel pipe piles as anchor piles.