Guangxi Bailong Nuclear Power Plant Marine Engineering
The marine engineering content of this nuclear power plant includes water intake, drainage, shore protection, wharf for large equipment offloading, rock blasting and dredging, and temporary dry construction. The seawater DC circulation water supply system is adopted, and the cooling water source is taken from and discharged to Beibu Gulf. The way of water intaking is by open channel, and box culvert is for discharging.