English
中文
English
Business scope
ServicesBusiness scope
Guangxi Bailong Nuclear Power Plant Marine Engineering
  • Project area
    Green energy field
  • Project type
    Nuclear offshore engineering
  • Project location
    Guangxi
The marine engineering content of this nuclear power plant includes water intake, drainage, shore protection, wharf for large equipment  offloading, rock blasting and dredging, and temporary dry construction. The seawater DC circulation water supply system is adopted, and the cooling water source is taken from and discharged to Beibu Gulf. The way of water intaking is by open channel, and box culvert is for discharging.
Headquarters contact information
020-32332222
292 Lijiao Road, Haizhu District, Guangzhou, China Communications Southern Design Building
© Copyright 2023CCCC- FHDI ENGINEERING CO,LTD. 版权所有粤ICP备2022126036号-1 粤公网安备:44010502001425号Powered by vancheer
TOP