Jinwan Offshore Wind Farm, Zhuhai
For this project, Six drilling ships equipped with marine drilling rigs were put into operation to carry out comprehensive surveys, including drilling, sampling, standard penetration test, static touch test, cross plate shear test, wave speed test, resistivity test and indoor test, etc., and the self-developed integrated marine GNSS positioning and navigation system was applied for the first time.